ABI Resources & Ser…'s logo

ABI Resources & Services Pte. Ltd.

Human resource consulting
Facebook Likes
2,600
2,600 follows
Category
Consulting agency
Monthly Visits
934
2025/6
Address
1 N Bridge Rd, #15-10 High Street Centre, Singapore 179094

Extra Info

Title: ABI


URL Source: http://www.abisingapore.com/


Published Time: Sun, 03 Aug 2025 14:52:13 GMT


Markdown Content:
Image 1


Saipem - Erha Deepwater Development


Development of drilling wells from a new drilling centre, installation of associated subsea facilities, and modifications to the existing floating production, storage and offloading (FPSO) unit. The FPSO consists of two trains of three-stage oil separation. Processed crude is stored in the hull and regularly offloaded to tankers via offloading lines and a catenary anchor leg mooring (CALM) buoy. Associated gas is compressed and dehydrated to provide fuel gas, with the remainder reinjected back into the producing reservoir. Water injection facilities inject treated seawater into the reservoir for pressure maintenance to enhance oil production. Seawater treatment includes filtration and deaeration.


Image 2


Total E&P Myanmar – Yadana Subsidence


The offshore production complex consists of two remote wellhead platforms, one bridge-linked wellhead platform, a production platform, a living quarters platform, and a medium compression platform. Produced gas is exported through two pipelines. The first, 409-kilometre-long (254 mi) pipeline runs 346 kilometres (215 mi) underwater from Yadana to Daminseik at the coast. From there, a 63-kilometre (39 mi) onshore section runs to the Thai border at Pilok. The onshore section crosses a region inhabited by the Karen, a minority ethnic group hostile to the government.[4] Construction of the pipeline was completed in 1998 and it cost US$1.2 billion.[5]


Image 3


Total E&P Myanmar - Badamyar Gas


The Badamyar gas project involves the development of the Badamyar gas field offshore facilities> which include Living quatres production modules and subsea pipelines, off the shore of Myanmar. The Badamyar project involves the installation of a new wellhead platform connected to the Yadana production facilities, and the drilling of 4 horizontal wells to develop the Badamyar gas field as a satellite of Yadana. The project also includes a new compression platform. Launched in mid-2014, the project was completed with no Lost Time Injury occurrences during the 5 million man-hours worked.


Image 4


ENI - Jangkrik


Installation of a new barge floating production unit (FPU) with a treatment capacity of 450mmscf/d of gas and condensates. Construction of the FPU was completed in March 2017. The FPU is tied back to the East Kalimantan pipeline, which further conveys the produced gas to PT Badak’s Bontang LNG plant where the gas will be liquefied, and the condensates will be conveyed to Senipah Terminal. The Jangkrik FPU is expected to become a hub for the development of nearby gas discovery Merakes, which is slated to begin production within the next two years. The project is $1.1bn engineerings, procurement, construction and installation (EPCI) contract for the FPU. The topsides were fabricated at Saipem’s Karimun Island Yard and the hull was fabricated at HHI’s Ulsan yard in South Korea.


Image 5


Total Angola - Kaombo Norte & Sul


The Kaombo project is located in Block 32, of Angola ultra-deep Offshore Field spread across six fields connected via 300 kilometres of subsea pipelines to two Floating Production, Storage and Offloading (FPSO) vessels: Kaombo Norte and Kaombo Sul. This massive, complex project has some unique characteristics: First, the water depths involved, which reach up to 1,950 meters. The extreme temperature and pressure conditions at such depths require the use of technology that is both reliable and cost-effective. Given these unprecedented depths, the Kaombo project is perfectly aligned with TotalEnergies' strategy of rising to the challenge of ultra-deep offshore.


Image 6


Inpex - Ichthys FPSO


The unique 4,200 tonnes modules with 31 metre-tall turret structure, which travelled from Singapore, was inserted into the hull of the FPSO, constructed at DSME yard in Okpo, South Korea. Three components make up the overall FPSO turret: the lower turret, the manifold and the gantry frame. The turret will measure 85 metres in height and weigh 8,700 tonnes, making it one of the largest in the world. The onshore scope of work for Ichthys LNG included the construction of two LNG processing trains, product storage tanks, a product loading jetty, a module offloading facility, a combined cycle power plant, utilities, permanent building facilities and an accommodation village.


Image 7


ENI Merakes


This project covers five deepwater wells, and their 50-kilometre tie back to the existing Jangkrik Floating Production Unit in Indonesia. The project scope includes engineering, procurement, installation and pre-commissioning of subsea equipment such as subsea trees, a manifold, large-bore deepwater high-pressure flexible lines, umbilicals and distribution hardware, flexible risers, flowlines and jumpers. The Project is a deep-water gas field development at offshore Kutei Basin, with approximately 1,500 meters water depth. The field is connected to the Jangkrik Floating Production Unit (FPU), operated by Eni, at a distance of 45 km from Merakes field. The gas produced from Merakes is exported through subsea pipelines to the Jangkrik FPU.

Similar Businesses

Payboy - Singapore Human Resources Software

Human resource consulting
5.0 (54)
+65 6910 9115

Nous Network Pte. Ltd.

Human resource consulting
5.0 (50)
OPS & StickMeOnz

HR Guru Pte Ltd

Human resource consulting
5.0 (31)
Tat Ann Building
[email protected]
+65 6443 4328

recruitSG

Human resource consulting
5.0 (30)
Henderson Building
[email protected]
+65 8897 4587

Resource Impactz LLP

Human resource consulting
5.0 (7)
+65 8755 2512

The Growth Project - Singapore HR Consultancy

Human resource consulting
5.0 (6)
+65 6910 9115

Impact Best Pte Ltd

Human resource consulting
5.0 (6)
[email protected]
+65 6411 7278

EnableGroup Asia – HR Services & Consultancy Agency in Singapore

Human resource consulting
5.0 (5)
The Plaza
[email protected]
+65 6871 8801

Agile HRO

Human resource consulting
5.0 (3)
New Bahru
[email protected]
+65 3159 4151

HKM HR Management Pte. Ltd.

Human resource consulting
5.0 (3)
[email protected]
+65 6896 1012

KISS Consulting

Human resource consulting
5.0 (3)
Pacific Tech Centre
[email protected]
+65 8613 5768

Mavenside Consulting Pte Ltd

Human resource consulting
5.0 (3)
Ocean Financial Centre
+65 6655 8822

Verti Human Capital Pte Ltd

Human resource consulting
5.0 (2)
[email protected]
+65 6909 5691

Machspeed Human Resources

Human resource consulting
5.0 (2)
Keck Seng Tower
+65 6336 2530

Exponent Global Consulting Pte Ltd

Human resource consulting
5.0 (1)
+65 8901 7900

Premier HR Services

Human resource consulting
5.0 (1)
[email protected]
+65 6744 2075

H2 Consulting

Human resource consulting
5.0 (1)
Maplewoods
+65 6333 0992

Magenta Consulting Services Pte Ltd

Human resource consulting
5.0 (1)
+65 6720 6363

Payroll Services Singapore | Payroll Outsourcing | HR Services | Employment Pass Applications

Human resource consulting
5.0 (1)
[email protected]
+65 9769 3066

DecodeHR Pte Ltd

Human resource consulting
5.0 (1)
Marina Square
[email protected]
+65 6909 2917